Affordable Housing Requirements Advice to Developers

When submitting a major planning application (sites with 10 or more houses) you need to consider affordable housing obligations that need to be provided on the site. These items relate to the affordable housing schedule which will form part of the s106 legal agreement accompanying the permission.

The policy requires 35% affordable housing which would be 80:20 split of social rent and intermediate product as detailed in the South Somerset Local Plan 2006 – 2028 adopted in March 2015.

The tenure split which will now change due to the introduction of First Homes and the requirements for any application determined after 28 December 2021 (or 28 March 2022 if there has been significant pre application engagement) will be worked out as shown in the examples below:

Example 1: A scheme for 12 dwellings

35% affordable housing requirement through Policy HG3: 12 x 35% = 4.2 (4 affordable homes) 

The 4 affordable homes need to be calculated as a tenure mix of 25% First Homes and 75% social rented homes: 

25% = 1 First Home 

75% = 3 social rented homes 

The National Planning Policy Framework requires 10% of homes to be for affordable home ownership – 10% of 12 dwellings = 1.2 (one dwelling rounded). The single First Home meets the National Planning Policy Framework requirement. 

Example 2: A scheme for 150 dwellings

35% affordable housing requirement through Policy HG3: 150 x 35% = 52.5 (53 affordable homes)

The 53 affordable homes need to be calculated as a tenure mix of 25% First Homes and 75% social rented homes:

25% = 13 First Homes

75% = 40 social rented homes

The National Planning Policy Framework requires 10% of homes to be for affordable home ownership – 10% of 150 dwellings = 15 homes. As only 13 First Homes were calculated, a further 2 affordable home ownership products would be expected to meet the National Planning Policy Framework requirement.

The breakdown of property types is determined using the Strategic Housing Market Assessment and also using the available demand data for affordable housing such as housing needs survey verified need and the expressed need on the housing register (Homefinder Somerset).  This data is updated on a Monthly basis and can be obtained here:  South Somerset housing demand freedom of information requests.

We would expect the affordable units to be pepper potted throughout the site, that the units are developed to blend in with the proposed housing styles and prefer the dwellings to be houses/bungalows or if flats have the appearance of houses.

We may on larger sites accept some clustering spaced throughout (up to 10 on larger sites and less on smaller developments) the site ensuring that there are social rented properties included in each cluster.  We would also need a site plan to show where the affordable dwellings will be located.

We would expect our prevailing minimum internal space standards to be adhered to:

1 bedroom flat2 person47 m2
2 bedroom flat4 person66 m2
2 bedroom house4 person76 m2 (86 m2 if 3 storey)
3 bedroom house6 person86 m2 (94 m2 if 3 storey)
4 bedroom house8 person106 m2 (114 m2 if 3 storey)
4 bedroom parlour house8 person126 m2 (134 m2 if 3 storey)

We would expect the s106 agreement to contain appropriate trigger points to guarantee that some of the affordable housing provision is delivered in the event that the site gains permission but is only ever partially built out.

We would expect 1/3 of the affordable housing to be provided by the time 1/3 of the site has been completed and all of the affordable housing to be provided by 2/3 of the site being developed.

The s106 should also include a schedule of approved housing association partners for delivery of the affordable units.  Our main partners are:

  • LiveWest
  • Magna Housing
  • Stonewater Housing
  • Abri

These items detailed above relate to the affordable housing schedule which forms part of the s106 legal agreement accompanying the permission.

For further information, please contact your planning case officer.

Last reviewed: September 22, 2023 by William

Next review due: March 22, 2024

Back to top